SILVER DREAM (CE/1/A/91) RENUKA (11-0763) BISWAKALPA (03-0682) SAGAR KUNJ (13-0755) EKTARA (23-0658) PUBER DUAR (16-0596) ATASI (13-0763) ABASH (CC-73) AARVI (17-0634) NEELKAMAL...
SILVER DREAM (CE/1/A/91) RENUKA (11-0763) BISWAKALPA (03-0682) SAGAR KUNJ (13-0755) EKTARA (23-0658) PUBER DUAR (16-0596) ATASI (13-0763) ABASH (CC-73) AARVI (17-0634) NEELKAMAL...
https://www.youtube.com/watch?v=fv-vQBmvixk&ab_channel=SSKDEVELOPERS Piling work of Nirvana is started from 14th December 2022. Till now around 15 pile casting is completed and 30 more piles to...
https://youtu.be/30AJgpxiGqYAtasi is an individual 3BHK project of us which contains one unit in each floor. The cleaning work by JCB and Breaking down process of the concrete piles is under process to make the pile caps. The foundation work will be started Within few...
https://www.youtube.com/watch?v=YUX2gdwSiSc&ab_channel=SSKDEVELOPERSVishnu Villa is one of the best projects of us,ideal for residential purpose.Residents can enjoy the open view of the lake (New Town Water Treatment Plant) to the North side from the balcony entire life. There is also a beautiful park to the South of the project. So the residents have the advantage to enjoy the both...
https://youtu.be/z1TIY0JSmR0Roof casting of Shanti (CC-66) Ground Floor completed...
https://youtu.be/wjAa8jmBywYRoof casting of Sunita (DB-190) 3rd Floor completed today. In order to increase the speed of work, the work of bricklaying on the lower floor is also going...
https://www.youtube.com/watch?v=QWbr_leBnsk&ab_channel=SSKDEVELOPERSAfter the casting of the slab of the 1st floor, now the work of column casting is going on for the slab of the 2nd floor. At the same time, the work of masonry of lift wall and stairs is going on. It is expected that the slab can be cast within ten to fifteen...